Case Study: BHP BILLITON IRON ORE PTY LTD: ENVIRONMENTAL AUDIT OF PILBARA IRON ORE OPERATIONS, Western Australia - HydroSolutions
16602
single,single-post,postid-16602,single-format-standard,ajax_fade,page_not_loaded,,qode-child-theme-ver-1.0.0,qode-theme-ver-9.5,wpb-js-composer js-comp-ver-4.12,vc_responsive
 

Case Study: BHP BILLITON IRON ORE PTY LTD: ENVIRONMENTAL AUDIT OF PILBARA IRON ORE OPERATIONS, Western Australia

bhp-mtwindpanorama1

Case Study: BHP BILLITON IRON ORE PTY LTD: ENVIRONMENTAL AUDIT OF PILBARA IRON ORE OPERATIONS, Western Australia

THIS IS AN HISTORICAL PROJECT PROFILE

An environmental audit to collate a contaminated sites register was undertaken on behalf of BHP Billiton, in compliance with the Contaminated Sites Bill 2000.

Nine operational sites throughout the Pilbara were reviewed, including:

Mt Whaleback
Yandi (Marillana Creek)
Jimblebar
Ore Body 23/25
Redmont Railcamp
Yarrie/Nimingarra
Finucane Island
Nelson Point

A review of existing site investigation data was undertaken and a list of potentially contaminated sites was compiled.

A walkover survey of each area was undertaken together with a preliminary sampling exercise involving surface or shallow subsurface soils. A contaminated
sites register was compiled including soil & groundwater analyses with comparison to applicable National Environmental Protection Measure (NEPC 1999) and ANZECC 2000
guidelines.

Report formatting was compatible with a GIS database for future development. An initial qualitative risk assessment was undertaken using the BHP Occupational Health and safety (OHS&E) guidelines.

Recommendations were made for an appropriate environmental management plan for each area.

Stuart Jeffries
Hydrosolutions Pty Ltd

Case study: Environmental Audit

Click here to see a project summary
Click here for details of our capabilities in Environmental Auditing
Click here for other example Environmental Audit projects