Major Western Australian Based Iron ore Miner: GIS development for Redmont Railcamp, Contaminated Sites Audit, Pilbara, Western Australia - HydroSolutions
16828
post-template-default,single,single-post,postid-16828,single-format-standard,ajax_fade,page_not_loaded,,qode-child-theme-ver-1.0.0,qode-theme-ver-9.5,wpb-js-composer js-comp-ver-4.12,vc_responsive
 

Major Western Australian Based Iron ore Miner: GIS development for Redmont Railcamp, Contaminated Sites Audit, Pilbara, Western Australia

Major Western Australian Based Iron ore Miner: GIS development for Redmont Railcamp, Contaminated Sites Audit, Pilbara, Western Australia

THIS IS AN HISTORICAL PROJECT PROFILE

A geographical information system (GIS) was developed for the Redmont Railcamp on behalf of a major WA based iron Ore miner as part of it’s contaminated sites audit project.

Three basic visual levels were established, including site location &
context (1), overall site layout (2) and detailed maps of individual areas (3).

Data availability was indicated using icons hotlinked to data files for on-
screen interrogation, including photographic and analytical data.

Topographic, AutoCAD and Microstation drawing files were
compiled and included as overlays.

Environmental monitoring data including soil bores, surface and
subsurface scrapings, groundwater monitoring & analytical data were
also compiled on the database. An interactive query system was
established allowing multiple queries of varying data to provide specific
answers on site conditions, to an agreed format compatible with other
software applications.Incompatible landuses were identified, including a preliminary groundwater source protection areas for the on-site potable water supply..

Stuart Jeffries
Hydrosolutions Pty Ltd

Click here to see a project summary
Click here for details of our capabilities in GIS
Click here for other example GIS projects

Stuart Jeffries
Hydrosolutions Pty Ltd

GIS2